Beetham Tower.
A 47 floor prestigious tower development in the heart of Manchester City Centres’ Castlefield District. A split residential, retail and commercial development in a previously run down area of Manchester which sparked a rejuvenation and gentrification of the surrounding area. Floors 1 to 22 are occupied by the Hilton hotel, with remaining floors occupied by residential apartments and 4 penthouses.
As a sub consultant to the main engineering consultants we were responsible for:
External infrastructure
Hard landscaping
Drainage systems - sanitary and surface water
Connections to utilities
Connections to public sewers
Tower internal building drainage systems
Liaison with local authorities and public utilities